Lok Ma Chau Emergency Hospital, Hong Kong
A fast-track emergency hospital project announced by the Hong Kong SAR Government in March 2022, supplied with more than 8,000 cabinets.
Project profile
| Sector | Healthcare & emergency response |
|---|---|
| Location | Lok Ma Chau, Hong Kong |
| Announced | March 2022 |
| Scope | More than 8,000 cabinets |
| Delivery | Emergency fast-track |
Project background
On 4 March 2022, the Hong Kong SAR Government announced the Lok Ma Chau emergency hospital project with support from the central government. The mainland team accelerated construction of the quarantine treatment center.
RackSource received an order for more than 8,000 cabinets. The project ran while pandemic controls disrupted transport, site access and staffing, so production and logistics had to be sequenced against the installation schedule.
Emergency projects compress procurement, manufacturing and delivery into weeks. The cabinet supply had to be complete, consistent and labeled for a site that was still being built.
Project challenge
The project required thousands of cabinets on a compressed schedule while construction and logistics were disrupted by pandemic controls. Delivery had to be sequenced to match site installation.
What the project required
- More than 8,000 cabinets on a compressed schedule
- Consistent configuration across production batches
- Packing and documentation for each batch
- Delivery sequenced to site installation
Scope of supply
- 01 Emergency production planning and priority material allocation
- 02 More than 8,000 cabinets manufactured and supplied
- 03 Green-channel logistics for site access
- 04 Batch delivery aligned with installation sequence
How the project was delivered
- 01
Emergency plan
Production capacity and material supply were reserved for the project at short notice.
- 02
Batch production
Cabinets were produced in batches, each inspected before packing.
- 03
Green-channel logistics
Transport and site access were coordinated to keep materials moving through pandemic controls.
- 04
Sequence delivery
Batches were aligned with the site installation sequence to avoid double handling.
Each batch was inspected before packing; labels, packing lists and delivery sequence were aligned with the site team so cabinets could be installed without re-sorting.
The cabinets were delivered safely and efficiently, supporting the construction of the emergency treatment center. The project remains a reference for rapid response manufacturing.
Project questions
03 Q&A How many cabinets were supplied?
How was the schedule managed?
What was the quality control approach?
Send us your rack schedule or floor plan
Share cabinet quantities, U heights, power loads and the destination port. Our engineering team will confirm the configuration, drawing and production lead time.
Request a quotation