Server Rack Case Studies — Data Center, Telecom and Emergency Projects
Project references with location, scope, configuration and delivery approach.
Case studies cover data center, telecom, healthcare and transport projects. Typical scope includes 20 to 200 cabinets, 42U heights, 800 kg loads and 20 to 45 day delivery, with configuration and result data.
Last reviewed: 2026-11-07
Project references are selected by sector, location and scope rather than by a generic “success story.” The detail pages add background, requirements, delivery steps and quality documentation.
Use the case list to find a project similar to yours, then open the detail page for the configuration and supply scope.
Best for
- Buyers checking project experience
- Projects with similar scope or sector
- Tenders requiring reference cases
Key specifications
Selected project references
| Project | Sector | Scope | Location |
|---|---|---|---|
| CAS Weihai Computing Power Center | Research computing | Enclosed cold/hot aisle | Weihai, China |
| Lok Ma Chau Emergency Hospital | Healthcare/emergency | 8,000+ cabinets | Hong Kong |
| Mohan Station Command Center | Rail/transport | Monitoring consoles | Yunnan, China |
| CASIC AI Demonstration | AI demonstration | 4 demonstration cabinets | China |
How to choose
Find a similar sector
Start from data center, telecom, healthcare or transport cases.
Compare the scope
Check whether the case covers cabinets, containment, consoles or a full room.
Review the delivery
Check batch delivery, emergency response or factory inspection.
Research computing CAS Integration Computing Power Center, Weihai A 100P intelligent computing power center in the Railway Smart Logistics Park, planned to support regional digital infrastructure and AI workloads.
Healthcare & emergency response Lok Ma Chau Emergency Hospital, Hong Kong A fast-track emergency hospital project announced by the Hong Kong SAR Government in March 2022, supplied with more than 8,000 cabinets.
Rail & transport Mohan Station Command Center, China-Laos Railway Mohan Station is the final station on the China section of the China-Laos Railway and a key connecting hub. RackSource supplied intelligent monitoring consoles for its command center.
AI demonstration CASIC AI Demonstration Project A four-cabinet AI demonstration platform combining cooling, computing, scheduling and storage systems with a 32-inch interactive touchscreen. Frequently asked questions
03 Q&A Can these cases be used as references?
Do you have projects in our country?
Can we visit a reference site?
Send us your rack schedule or floor plan
Share cabinet quantities, U heights, power loads and the destination port. Our engineering team will confirm the configuration, drawing and production lead time.
Request a quotation