Project profile

Sector Research computing
Location Weihai, Shandong, China
Planned capacity 100P intelligent computing
Scope Enclosed cold/hot aisle system
Delivery Factory delivery
Project background

Project background

The CAS Integration Computing Power Center is located in the Railway Smart Logistics Park, Maoshan Town, Lingang District, Weihai. It is planned as a 100P intelligent computing center serving regional AI and digital infrastructure.

A dense computing hall concentrates heat in a small footprint. The project separated cold supply from hot return with an enclosed aisle system, so the cooling equipment receives a predictable return-air temperature instead of a mixture of hot and cold streams.

Because the aisle is also a working space, the design had to keep doors, cable entries and service access usable while maintaining the seal. The containment was coordinated with the row-level cooling and fire strategy.

Project challenge

Project challenge

The hall needed to isolate cold and hot air across dense compute rows while keeping the aisle accessible for service. Fire safety required skylights that open automatically on alarm.

What the project required

What the project required

  • Isolate cold and hot air across the compute rows
  • Keep the aisle accessible for service and cable work
  • Release skylights automatically on fire alarm
  • Coordinate containment with row-level cooling
What we supplied

Scope of supply

  • 01 Enclosed cold/hot aisle system with modular skylights
  • 02 Fire-release skylight mechanism linked to the alarm system
  • 03 Access doors and cable-entry sealing for the full row
  • 04 Coordination with the row-level cooling layout
How the project was delivered

How the project was delivered

  1. 01

    Design review

    Aisle width, row length, door positions and cooling layout were reviewed before fabrication.

  2. 02

    Fabrication

    Aluminum frame, skylights, glass doors and sealing panels were produced as a modular kit.

  3. 03

    Installation

    The frame was installed independently of cabinet load-bearing, followed by doors and seals.

  4. 04

    Commissioning

    Door operation, skylight release and airflow were checked with the fire and cooling trades.

Quality and documentation

The containment frame, glass panels and release mechanisms were checked before packing. Installation and commissioning were coordinated with the fire and cooling trades so the aisle could be handed over as a working system.

Outcome

The containment creates independent airflow zones so hot air returns directly to the cooling equipment. The project supports provincial and municipal digital infrastructure construction and serves as a digital economy demonstration center.

Project questions

Why use cold/hot aisle containment in a computing hall?

Dense compute rows discharge heat into the same room that supplies cold air. Containment separates the two streams, so the cooling units see a more predictable return temperature and the server intakes stay closer to design conditions.

How is fire safety handled?

Skylights are held by a release mechanism linked to the fire alarm. On alarm, panels open so suppressant can enter the aisle. The release is tested with the fire system during commissioning.

Can the containment be extended later?

Yes. The frame is modular, so additional aisle sections, doors or skylights can be added when the row is extended. The interface should be defined in the first phase.
Start a project

Send us your rack schedule or floor plan

Share cabinet quantities, U heights, power loads and the destination port. Our engineering team will confirm the configuration, drawing and production lead time.

Request a quotation