Mohan Station Command Center, China-Laos Railway
Mohan Station is the final station on the China section of the China-Laos Railway and a key connecting hub. RackSource supplied intelligent monitoring consoles for its command center.
Project profile
| Sector | Rail & transport |
|---|---|
| Location | Mohan Station, Xishuangbanna, Yunnan |
| Project | China-Laos Railway command center |
| Scope | Intelligent monitoring consoles |
| Delivery | Factory delivery |
Project background
Mohan Station is the final station on the China section of the China-Laos Railway and a key connecting hub. Its command center coordinates passenger, freight and security operations.
RackSource supplied intelligent monitoring consoles for the command center. The consoles had to support 24-hour operation, clear sightlines to the monitoring wall and reliable cable management for multiple operator positions.
The project required factory assembly and finish inspection so the consoles could be installed and commissioned without site fabrication.
Project challenge
The command center needed continuous 24-hour operation, clear sightlines to monitoring walls and reliable cable management for multiple operator positions.
What the project required
- 24-hour operator comfort and sightlines
- Multi-operator layout with monitor supports
- Integrated power and data cable routing
- Factory assembly and finish inspection
Scope of supply
- 01 Intelligent monitoring consoles for the command center
- 02 Multi-operator layout with monitor arms
- 03 Integrated power and data cable routing
- 04 Factory assembly and finish inspection
How the project was delivered
- 01
Layout review
Room plan, operator count and monitor sizes were reviewed before fabrication.
- 02
Console build
Steel frame, work surface and monitor supports were fabricated to the layout.
- 03
Cable integration
Power and data routes were integrated into vertical and horizontal trays.
- 04
Factory inspection
Consoles were assembled and finish-checked before packing.
The consoles were assembled and inspected before packing; work surfaces, monitor supports and cable routes were checked against the room layout.
The consoles support the command center’s 24-hour operational efficiency. RackSource was selected as a core supplier for the project.
Project questions
03 Q&A What was supplied for the command center?
How is cable management handled in the consoles?
Can the console layout be adapted to another room?
Products used in this project
Send us your rack schedule or floor plan
Share cabinet quantities, U heights, power loads and the destination port. Our engineering team will confirm the configuration, drawing and production lead time.
Request a quotation