42U Integrated Micro Data Center Cabinet
A factory-integrated 42U room with cooling, UPS, fire and monitoring.
A 42U integrated micro data center packs 42U of IT space, a 10 kVA to 30 kVA UPS, 25 kW to 50 kW of cooling, fire suppression and monitoring into a 600 × 1200/1400 mm footprint. It typically serves 1 to 4 cabinets, achieves a PUE of about 1.3 to 1.5, and is assembled and tested in the factory before shipment.
Last reviewed: 2026-11-07
The JZ-IDC Series packages the infrastructure of a small computer room into a single 600 mm × 1200/1400 mm × 42U cabinet. Cooling, UPS, power distribution, fire suppression, access control and environmental monitoring are installed and tested before shipment.
On site, the cabinet needs only a power feed, a network uplink and condensate drainage where applicable. This makes it suitable for branch offices, laboratories, factory floors and edge computing sites where a conventional room is too slow or too expensive to build.
- Integrated rack or row-level air conditioning
- Integrated UPS and modular power distribution
- Clean-agent fire suppression with alarm linkage
- Temperature, humidity, smoke, door and power monitoring
- Access control by card, fingerprint or password
- Factory functional test before packing
Technical specifications
| Dimensions | 600 × 1200/1400 × 42U mm |
|---|---|
| Cooling capacity | 4 / 8 / 12.5 kW rack-mounted |
| UPS | Integrated modular, project-sized |
| Power distribution | Mains, UPS and air-conditioning branches |
| Fire suppression | Clean-agent canister, alarm linkage |
| Monitoring | Local touchscreen and remote access |
Typical applications
- 01 Branch offices and remote sites
- 02 Factory automation and edge computing
- 03 Laboratories and research rooms
- 04 Retail and healthcare satellite sites
What an integrated micro data center is
An integrated micro data center is a factory-built IT room in a cabinet footprint. It combines the rack, cooling, UPS, power distribution, fire suppression, access control and environmental monitoring in one enclosure, so the site only needs a power feed, a network connection and a prepared floor.
It is used for edge computing, branch offices, hospitals, factories, retail sites and small research labs where a traditional computer room is too large or too slow to build. The 42U frame provides 1,866.9 mm of mounting height for servers, storage and network equipment.
Capacity, footprint and cooling
A single-cabinet unit is typically 600 mm wide, 1,200 mm or 1,400 mm deep and 42U high. A 1,200 mm deep unit suits standard servers; 1,400 mm gives more room for rear cooling and cabling. Multiple cabinets can be joined into a 2-cabinet or 4-cabinet pod with a shared cooling and power module.
Cooling capacity is commonly 25 kW to 50 kW per pod, using rack-mounted or row-level air conditioners. The actual IT load depends on the server configuration; confirm the heat load, the redundancy level and the ambient conditions before selecting the cooling unit.
Power, UPS and redundancy
The integrated UPS is usually a modular or tower unit rated from 10 kVA to 30 kVA, with N+1 module redundancy or a 2N configuration for critical sites. Battery runtime is typically 10 to 30 minutes at full load, using VRLA or lithium batteries in a dedicated cabinet.
Power distribution includes input breakers, a maintenance bypass, metered PDUs and surge protection. For sites with unstable power, add an automatic transfer switch and a generator interface. Confirm the input voltage, frequency and earthing system for the destination country.
Fire, security and monitoring
Fire protection typically uses a clean-agent suppression system with smoke and heat detectors. The cabinet is sealed to hold the agent, and the system is interlocked with the power supply. Access control can be a card reader, keypad or biometric lock, with door alarms and audit logs.
Monitoring covers temperature, humidity, water leakage, smoke, power quality and door status. A local touchscreen shows the live status; remote access uses SNMP, Modbus or a web portal. Alarms can be sent by email, SMS or a monitoring platform.
Factory assembly, delivery and commissioning
The unit is assembled, wired and tested in the factory before shipment. Testing includes power-on, UPS transfer, cooling start-up, alarm simulation and leak checks. The cabinet ships as a single unit where the access route allows; otherwise it is split into modules for site assembly.
Typical lead time is 30 to 45 working days after drawing approval, depending on the cooling and UPS configuration. Site work includes positioning, power connection, network connection, water or condensate drain (for some cooling units), commissioning and operator training.
42U integrated micro data center reference specifications
| Item | Typical value | Notes |
|---|---|---|
| Height | 42U (1,866.9 mm mounting) | Single cabinet |
| Width | 600 mm | 2–4 cabinet pods available |
| Depth | 1,200 mm / 1,400 mm | 1,400 mm for rear cooling |
| IT load | 25–50 kW per pod | Confirm server heat load |
| UPS | 10–30 kVA | Modular or tower |
| UPS redundancy | N+1 or 2N | By project |
| Battery runtime | 10–30 minutes | VRLA or lithium |
| Cooling | Rack-mounted / row-level | 25–50 kW |
| Fire suppression | Clean agent | Smoke and heat detection |
| Monitoring | Touchscreen + remote | SNMP / Modbus / web |
| PUE | About 1.3–1.5 | Depends on site and load |
| Ingress protection | IP20 | Indoor use |
Configuration options
| Option | Choices | Typical use |
|---|---|---|
| Cabinet count | 1 / 2 / 4 | Edge to small room |
| Cooling | Rack AC / row AC / heat exchanger | By heat load |
| UPS | Modular / tower | 10–30 kVA |
| Battery | VRLA / lithium | Runtime target |
| PDU | Metered / switched | Remote monitoring |
| Fire system | Clean agent / aerosol | By site policy |
| Access control | Card / keypad / biometric | Security level |
| Monitoring | Local / remote / cloud | O&M model |
Packing and delivery reference
| Item | Typical value | Notes |
|---|---|---|
| Packing | Wooden crate | Seaworthy |
| Added dimensions | 100–150 mm per side | Varies by module |
| Added weight | 150–300 kg | Including crate |
| Container quantity | 2–6 units per 40HQ | Depends on size |
| Lead time | 30–45 working days | After drawing approval |
| Site work | 1–3 days | Positioning and commissioning |
Questions buyers ask
09 Q&A How much IT space is left inside?
Can the integrated cabinet be expanded later?
What maintenance access is required?
How many servers can a 42U integrated micro data center hold?
What UPS size does an integrated micro data center need?
How much cooling does a 42U micro data center need?
Can an integrated micro data center be installed outdoors?
What is the lead time for an integrated micro data center?
Does the unit come pre-tested?
Related products
JZ-UPS Series Modular UPS System 50–1200 kVA modular online UPS for centralized power rooms. View details
JZ-CA Series Cold Aisle Containment System Modular skylights, doors and seals that separate cold supply from hot return. View details
JZ-PDU Series Rack Power Distribution Unit 1U or 0U power distribution with optional breaker, SPD and metering. View details Need this configured for your project?
Send the rack elevation, power load and quantity. We will confirm dimensions, outlet types and lead time.
Get a Quote