Quick answer

A 42U integrated micro data center packs 42U of IT space, a 10 kVA to 30 kVA UPS, 25 kW to 50 kW of cooling, fire suppression and monitoring into a 600 × 1200/1400 mm footprint. It typically serves 1 to 4 cabinets, achieves a PUE of about 1.3 to 1.5, and is assembled and tested in the factory before shipment.

Last reviewed: 2026-11-07

JZ-IDC integrated micro data center cabinet with monitoring screen
42U Integrated Micro Data Center Cabinet — Image 1
42U Integrated Micro Data Center Cabinet — Image 2
42U Integrated Micro Data Center Cabinet — Image 3
Key features

The JZ-IDC Series packages the infrastructure of a small computer room into a single 600 mm × 1200/1400 mm × 42U cabinet. Cooling, UPS, power distribution, fire suppression, access control and environmental monitoring are installed and tested before shipment.

On site, the cabinet needs only a power feed, a network uplink and condensate drainage where applicable. This makes it suitable for branch offices, laboratories, factory floors and edge computing sites where a conventional room is too slow or too expensive to build.

  • Integrated rack or row-level air conditioning
  • Integrated UPS and modular power distribution
  • Clean-agent fire suppression with alarm linkage
  • Temperature, humidity, smoke, door and power monitoring
  • Access control by card, fingerprint or password
  • Factory functional test before packing

Technical specifications

Dimensions 600 × 1200/1400 × 42U mm
Cooling capacity 4 / 8 / 12.5 kW rack-mounted
UPS Integrated modular, project-sized
Power distribution Mains, UPS and air-conditioning branches
Fire suppression Clean-agent canister, alarm linkage
Monitoring Local touchscreen and remote access

Typical applications

  • 01 Branch offices and remote sites
  • 02 Factory automation and edge computing
  • 03 Laboratories and research rooms
  • 04 Retail and healthcare satellite sites

What an integrated micro data center is

An integrated micro data center is a factory-built IT room in a cabinet footprint. It combines the rack, cooling, UPS, power distribution, fire suppression, access control and environmental monitoring in one enclosure, so the site only needs a power feed, a network connection and a prepared floor.

It is used for edge computing, branch offices, hospitals, factories, retail sites and small research labs where a traditional computer room is too large or too slow to build. The 42U frame provides 1,866.9 mm of mounting height for servers, storage and network equipment.

Capacity, footprint and cooling

A single-cabinet unit is typically 600 mm wide, 1,200 mm or 1,400 mm deep and 42U high. A 1,200 mm deep unit suits standard servers; 1,400 mm gives more room for rear cooling and cabling. Multiple cabinets can be joined into a 2-cabinet or 4-cabinet pod with a shared cooling and power module.

Cooling capacity is commonly 25 kW to 50 kW per pod, using rack-mounted or row-level air conditioners. The actual IT load depends on the server configuration; confirm the heat load, the redundancy level and the ambient conditions before selecting the cooling unit.

Power, UPS and redundancy

The integrated UPS is usually a modular or tower unit rated from 10 kVA to 30 kVA, with N+1 module redundancy or a 2N configuration for critical sites. Battery runtime is typically 10 to 30 minutes at full load, using VRLA or lithium batteries in a dedicated cabinet.

Power distribution includes input breakers, a maintenance bypass, metered PDUs and surge protection. For sites with unstable power, add an automatic transfer switch and a generator interface. Confirm the input voltage, frequency and earthing system for the destination country.

Fire, security and monitoring

Fire protection typically uses a clean-agent suppression system with smoke and heat detectors. The cabinet is sealed to hold the agent, and the system is interlocked with the power supply. Access control can be a card reader, keypad or biometric lock, with door alarms and audit logs.

Monitoring covers temperature, humidity, water leakage, smoke, power quality and door status. A local touchscreen shows the live status; remote access uses SNMP, Modbus or a web portal. Alarms can be sent by email, SMS or a monitoring platform.

Factory assembly, delivery and commissioning

The unit is assembled, wired and tested in the factory before shipment. Testing includes power-on, UPS transfer, cooling start-up, alarm simulation and leak checks. The cabinet ships as a single unit where the access route allows; otherwise it is split into modules for site assembly.

Typical lead time is 30 to 45 working days after drawing approval, depending on the cooling and UPS configuration. Site work includes positioning, power connection, network connection, water or condensate drain (for some cooling units), commissioning and operator training.

42U integrated micro data center reference specifications

ItemTypical valueNotes
Height42U (1,866.9 mm mounting)Single cabinet
Width600 mm2–4 cabinet pods available
Depth1,200 mm / 1,400 mm1,400 mm for rear cooling
IT load25–50 kW per podConfirm server heat load
UPS10–30 kVAModular or tower
UPS redundancyN+1 or 2NBy project
Battery runtime10–30 minutesVRLA or lithium
CoolingRack-mounted / row-level25–50 kW
Fire suppressionClean agentSmoke and heat detection
MonitoringTouchscreen + remoteSNMP / Modbus / web
PUEAbout 1.3–1.5Depends on site and load
Ingress protectionIP20Indoor use

Configuration options

OptionChoicesTypical use
Cabinet count1 / 2 / 4Edge to small room
CoolingRack AC / row AC / heat exchangerBy heat load
UPSModular / tower10–30 kVA
BatteryVRLA / lithiumRuntime target
PDUMetered / switchedRemote monitoring
Fire systemClean agent / aerosolBy site policy
Access controlCard / keypad / biometricSecurity level
MonitoringLocal / remote / cloudO&M model

Packing and delivery reference

ItemTypical valueNotes
PackingWooden crateSeaworthy
Added dimensions100–150 mm per sideVaries by module
Added weight150–300 kgIncluding crate
Container quantity2–6 units per 40HQDepends on size
Lead time30–45 working daysAfter drawing approval
Site work1–3 daysPositioning and commissioning

Questions buyers ask

How much IT space is left inside?

After cooling, UPS and distribution, a 42U frame typically leaves 30U–36U for IT equipment. The exact split depends on the cooling capacity and battery runtime selected.

Can the integrated cabinet be expanded later?

Yes. Additional cabinets can be bayed to the first unit, and UPS capacity can be increased with modular power modules. The expansion plan should be defined before the first unit is built.

What maintenance access is required?

Allow at least 800 mm at the front for door swing and operator access, and rear access for cooling and cabling. Confirm the condenser or heat-rejection path at the design stage.

How many servers can a 42U integrated micro data center hold?

A single 42U cabinet can hold up to 42 1U servers if no other equipment is installed. In practice, switches, patch panels, PDUs, cable managers and blanking panels reduce the usable count to about 30 to 36 1U devices.

What UPS size does an integrated micro data center need?

A typical single-cabinet unit uses a 10 kVA to 30 kVA UPS. Size the UPS for the actual IT load plus 20% to 30% headroom, and confirm the battery runtime required by the site.

How much cooling does a 42U micro data center need?

Cooling is commonly 25 kW to 50 kW per pod, depending on the IT load and the room conditions. A cabinet with 10 kW of IT load needs at least 10 kW of cooling plus margin; confirm with a heat-load calculation.

Can an integrated micro data center be installed outdoors?

A standard indoor unit is not weatherproof. For outdoor sites, use an IP55 or IP65 enclosure with insulation, a sun shield and an industrial cooling unit, or house the unit in a small prefabricated shelter.

What is the lead time for an integrated micro data center?

Typical lead time is 30 to 45 working days after drawing approval. Custom cooling, lithium batteries, fire suppression and access control can extend the schedule.

Does the unit come pre-tested?

Yes. The factory tests power-on, UPS transfer, cooling start-up, alarm simulation and leak checks before shipment. Site commissioning still requires power, network and cooling connections.
Start a project