Container Data Center — Prefabricated IT Capacity in a Container
Containerized data centers with racks, power, cooling and monitoring in a transportable shell.
A container data center is an ISO 20 ft or 40 ft module with 10 to 20 racks, integrated UPS, cooling and fire suppression. A 40 ft module typically supports 200 kW to 500 kW of IT load, ships in 8 to 16 weeks, and needs only a foundation, power and network connection on site.
Last reviewed: 2026-11-07
Containers reduce site construction and can be shipped as a tested unit. The project must plan transport, foundation, power and network connections.
Cooling and fire strategy are designed for the container layout, not a conventional room.
Best for
- Remote or temporary capacity
- Fast deployment projects
- Sites with limited construction resources
Key specifications
Container vs prefabricated
| Format | Mobility | Typical use |
|---|---|---|
| Container | High | Remote/temporary |
| Prefabricated room | Low | Permanent expansion |
How to choose
Check transport
Confirm road, crane and foundation requirements.
Define services
Plan power, network, water and drainage.
Confirm cooling
Select cooling for the container heat load.
What a container data center is
A container data center is a data hall built inside an ISO container or a similar steel module. It includes racks, cooling, power distribution, UPS, fire suppression and monitoring. The module is factory-built, tested and shipped as a unit.
It is used for rapid deployment, temporary capacity, remote sites, military and disaster recovery. The ISO footprint simplifies transport by truck or ship and reduces on-site construction.
Size, rack count and layout
A 20 ft container typically holds 5 to 10 racks; a 40 ft container holds 10 to 20 racks. Racks are usually 600 mm or 800 mm wide and 1,200 mm deep, with a 1,200 mm aisle. The container includes a service aisle, a cooling area and a power room.
Confirm the internal dimensions, the door opening and the transport route. A 40 ft container needs a clear route, a crane or a heavy forklift, and a foundation designed for the weight.
Power, cooling and efficiency
A container module typically includes an integrated UPS, switchgear, busway and row or perimeter cooling. A 40 ft module can support 200 kW to 500 kW of IT load, depending on the cooling and power configuration.
Containment and a sealed envelope allow a higher supply temperature and a PUE of about 1.2 to 1.5. Free cooling is possible in suitable climates. For critical sites, use N+1 or 2N power and cooling.
Delivery and commissioning
Typical lead time is 8 to 16 weeks after drawing approval, depending on the module and the power/cooling configuration. Site work includes the foundation, module placement, power and network connection, cooling commissioning and integrated testing.
Container data center reference
| Item | 20 ft | 40 ft |
|---|---|---|
| Racks | 5–10 | 10–20 |
| IT load | 100–250 kW | 200–500 kW |
| Cooling | Row / perimeter | Row / perimeter |
| UPS | Integrated | Integrated |
| PUE | 1.2–1.5 | 1.2–1.5 |
| Lead time | 8–16 weeks | 8–16 weeks |
| Transport | Truck / ship | Truck / ship |
| Site work | 3–8 weeks | 4–10 weeks |
Container vs prefabricated hall
| Item | Container | Prefabricated hall |
|---|---|---|
| Mobility | High | Low |
| Racks | 5–20 | 10–100+ |
| Transport | ISO standard | Custom modules |
| Expansion | Add containers | Add modules |
| Best for | Remote / temporary | Permanent campus |
Container options
| Option | Choices | Use |
|---|---|---|
| Size | 20 ft / 40 ft | Capacity |
| Cooling | Row / perimeter / free | Climate |
| UPS | N+1 / 2N | Criticality |
| Fire | Clean agent | Local code |
| Monitoring | BMS / cloud | O&M |
| Transport | Truck / sea | Distance |
Frequently asked questions
08 Q&A Can a container be relocated?
How many racks fit?
Is it a modular data center?
How many racks fit in a container data center?
How much IT load can a 40 ft container support?
What is the lead time for a container data center?
Can a container data center be relocated?
What PUE does a container data center achieve?
Related products
Send us your rack schedule or floor plan
Share cabinet quantities, U heights, power loads and the destination port. Our engineering team will confirm the configuration, drawing and production lead time.
Request a quotation